Friday, 24 June 2016

Locker lid gas lifter

Wow a lid that lifts its self not sure how happy i am with its enthusiasm to lift, flip the latch and its up. Hoping the oak and stainless steel cock pit bench tops will calm that.

Toilet plumbed

New skin fittings fitted and toilet plumbed in and tested. Awaiting sea trails.

Gally basics

We now have a sea water pump at the sink to save fresh water. We can also re-plumb it to pump the fresh water should the pressurised hot and cold fail.

Thursday, 9 June 2016

Batten down the hatches

The port lights came out easily today. No surprise they had been leaking. The sikaflex 291i goo bedded them in nicely.

Tidy

Cosy in the locker

Not a place i would choose to hang out laying in the bottom of chortles cockpit locker but after tightening so many jubilee clips one needs a little rest. And look at those brand new robust skin fittings, these will give me a little more reassurance chortle is not about to sink while on the water.

Friday, 3 June 2016

Crimps

With the same rig i lifted the engine in with i could conveniently load test my battery cable terminal crimps. Bounced about on this one, thats 90kg anyway. Thanks to my friendly electrical contractor who loaned me his hydraulic crimp tool all is fine and dandy.